Frequently Asked Questions

Climate footprint, bicycle parking spaces, daycare, landscaping... These are the questions we’ve been asked—here are the answers.


1. Sustainability in Construction and Operation


+Wouldn't it be more sustainable to renovate the old building?

Based on extensive research and consideration of various options, the restructuring of the campus and the construction of new buildings were found to be the best solution for the Deutz Campus in terms of ecology, economy, and urban planning.

+What is the soil sealing balance of the new campus?

The new campus grounds will be 10 percent less sealed than the old campus. Infiltration systems ensure a natural water cycle by collecting rainwater and directing it into the groundwater.

+Why not build higher to to unseal more soil?

The new campus buildings will be significantly lower than the existing high-rise. It is planned to have four stories (with six-story high points on the campus square) and will thus match the height of the surrounding districts of Deutz and Kalk. This is a deliberate decision by TH Köln, as the numerous requirements that university buildings must meet today (such as technical equipment, room concept, accessibility) cannot be implemented in the building typology of a high-rise. Added to this is the university's typical need for large hall and workshop areas.

+Will the demolition material be recycled?

Yes. Especially during the second and third construction phases of Deutz Campus, where demolition work will take place, the option of recycling will be examined and implemented wherever possible.

+What energy sources will be used during operation?

Renewable energies are to be used to the greatest extent possible on the new campus, including geothermal energy for heating and cooling the buildings. Extensive use of waste heat and existing environmental cooling is intended to enable the buildings' technical systems to save as much energy as possible. Extensive use of photovoltaics for power supply is also planned.
All new buildings will also be constructed to high energy standards and are expected to meet at least the Efficiency Building Standard 40. This means that, once in operation, they will consume 60 percent less primary energy than a reference building defined in the current Building Energy Act.
In order to take new technological developments into account as much as possible throughout the campus development, the concept will be thoroughly reviewed after each construction phase and adjusted as needed.

+What is the overall climate balance of the new campus?

Due to the long construction period and the ongoing adaptation of the energy concept to the specific requirements of the individual buildings, it is not yet possible to draw up an overall climate balance with final reliable figures at this stage.

The energy efficiency of the buildings in the first construction phase exceeds the requirements of the Building Energy Act (GEG) by 30 to 40 percent – this corresponds to the Efficiency Building Standard 55. The requirements for the second construction phase will be increased: the buildings will then be designed in accordance with Efficiency Building Standard 40.

Recyclable, low-pollutant, sustainable building materials are predominantly used in construction. For the second construction phase, the aim is also to achieve “Silver” certification under the Sustainable Building Assessment System. This certification includes, among other things, CO² accounting at the building level.

+What are the benefits of green roofs and vertical greening?

Roof and facade greening provide additional insulation, reduce energy consumption, and thus help save energy. In summer, the greening has a cooling effect. Building greening provides sound insulation, sequesters CO2, and has a positive impact on the urban climate. These green spaces also provide a habitat for small animals such as wild bees, beetles, spiders, and various bird species.



2. Tree Felling


+Why is felling necessary?

The trees must be removed where new buildings are being constructed. Trees must also be felled in areas where technical infrastructure (such as pipes and paths) runs. As a general rule, at the request of TH Köln - as few trees as possible should be felled.

One more note: Many trees have already been found to be in poor health, meaning that unfortunately they cannot be preserved in the long term.

Regarding Approval: The felling application was submitted to the relevant authorities of the City of Cologne for approval in the summer of 2021 and approved for the first fellings in February 2022.

+How many trees will be felled?

During the entire construction period (2022 to 2040), an estimated 604 trees (out of 818 existing trees) are expected to be felled. In order to preserve as many trees as possible for as long as possible, the tree felling will take place in eleven phases from winter 21/22 to winter 38/39. In the first phase, 110 trees will be felled to clear the site and allow for the initial construction work. The first phase of tree felling primarily affects the tree population on the grounds of the waste management facilities / fire department. Throughout the entire construction period, we will continually reassess in detail whether trees can be preserved after all.

+How many replacement trees will be planted?

We plan to plant 379 new trees across the entire campus. Approximately 270 trees will be planted in a forest area in Cologne as a compensatory measure.

Regarding the process: The necessary felling of existing trees will take place in phases, each corresponding to the respective construction phase. The new trees will also be planted in phases following the completion of each construction phase.

+Why are there so few new trees being planted to replace those that have been felled?

In order to meet the space requirements of TH Köln, it is currently not possible to plant additional trees on campus. The necessary planting areas cannot be made available. However, further potential tree locations will be examined during the course of the project. The trees felled at Deutz Campus will also be compensated for by replacement plantings in the inner-city area.

+Are there any tree relocations?

No replanting is currently planned. On the one hand, the damage to the trees' health that has been identified unfortunately makes replanting impossible. On the other hand, the necessary planting areas cannot be made available during the restructuring of the campus area.



3. Involvement of University Members and Local Residents


+Are students/teaching staff involved in the planning?

There is ongoing communication and intensive involvement of the faculties and students in various formats. This includes student research projects, research projects, and subject expertise on various topics in decision-making bodies and planning meetings.

With the start of the concrete construction phase, further participation from teaching staff and students is welcomed.

Student representatives are regularly informed about the progress of the project.

+Is it still possible to influence the plans?

The user groups affected at Deutz Campus will be involved in the planning for the respective buildings in good time so that special requirements can be taken into account as sfar as possible.

+Can the energy systems be used as a learning environment?

The roof areas and open spaces of Deutz Campus can also be used as a testing and research area in certain areas. The technical structures and systems required for the operation of Deutz Campus can be accessed in consultation with and accompanied by technical university staff as part of project work.

+How can residents get involved?

Community gardening (“urban gardening”) is planned: In the northern part of Campusallee, an experimental area with initially around 20 raised beds is planned. A concrete concept for its use is still in the planning stages. Sponsorships by university members and citizens are being considered. There are also plans for snack gardens that are publicly accessible and usable.



4. Features of the Campus


+How many bicycle parking spaces are planned?

Currently, 560 bicycle parking spaces and 69 spaces for cargo bikes are planned. The number of bicycle parking spaces was determined as part of a mobility concept in consultation with the City of Cologne.

In addition, a bicycle station with up to 100 bicycle parking spaces, charging facilities for e-bikes, a repair station, and showers are to be provided in the northern parking garage. The specific planning for this will take place in the second construction phase.

If the demand for bicycle parking spaces increases, the car parking spaces in the parking garage can be converted into bicycle parking spaces.

+How many car parking spaces are planned?

Two car parking garages with occupancy displays are planned for the new campus. The southern parking garage P2 will offer 350 parking spaces (intended for employees), while the northern parking garage P1 will offer 250 parking spaces (intended for students). Both parking garages will be equipped with electric charging stations.

Around 50 parking spaces will be distributed across the campus, including 25 barrier-free spaces and additional spaces for deliveries, transport services, etc.

The new plans are based on the concept of a car-free campus.

+Will there be a daycare center?

No. There will be no daycare center on the university campus. However, a daycare center is planned for the future site of the creative quarter, which will be developed after completion of the third construction phase.

+Are there plans for student housing on campus?

The existing student dormitories on campus will of course remain in place. There are no plans to provide additional housing for students.

+Will existing buildings remain?

Yes, the library and the faculty building for the Faculties of Architecture and Civil Engineering, including the adjacent hydraulic engineering laboratory, will remain.

+Are hall areas planned for large machinery?

The campus is an active teaching, learning, and research location, both indoors and outdoors. The new building plans also include machine halls and large, partly two-story laboratory areas, which will continue to enable and strengthen practice-oriented research. All road areas are also accessible for the transport of mobile work machines, etc.

+Can the plans be adapted to new requirements?

Yes. In principle, the site plans have been coordinated with and approved by the relevant ministry. As far as the specific structural design of the buildings is concerned (e.g., energy requirements, spatial relationships, and requirements), the construction concept is reviewed after each construction phase and adjusted if necessary.

+How will the new campus fit into its surroundings?

The new campus will no longer be isolated from the neighboring districts, but will open up to its surroundings. The site will be easy to navigate on foot and by bicycle, and its avenues and green spaces will invite visitors to linger. The campus will be a place of encounter - for citizens as well.



5. During the Construction Period


+Are pedestrian routes secured during the construction period?

The construction logistics plan always provides safe, barrier-free access for pedestrians and cyclists during the various stages of construction in order to minimize disruption during the construction process.

+Will there be sufficient bicycle parking spaces during the construction phase?

The bicycle parking spaces will be relocated to temporary areas as needed.

+Why is construction taking so long?

The restructuring of the campus, the increased complexity of constructing the replacement building within the existing structure and during ongoing university operations, but above all the time-consuming processes of urban land-use planning and the phased approval of the overall project by the Building and Real Estate Management Authority and the responsible ministries require a long planning and construction timeline.

+How can I stay informed about current disruptions, construction noise, etc.?

The project website will provide up-to-date information on the construction progress. As far as possible, phases involving significant noise and dust, as well as disruptions and detours, will be announced in a timely manner via various channels (social media, email).

#THneubaudeutz